Facio Corporation is committed to providing excellence in customer service and satisfaction through personalized care and superior applications knowledge. We have the real-life building automation & energy management experience achieved through successful project implementations across the commercial, educational and industrial marketplaces. Facio Corporation embraces open systems as it places the control where it should be – in the hands of owners. Some of our more recent projects include:
Branksome Hall Athletics & Wellness Centre
10 Elm Ave, Toronto, ON
associated with the Branksome Hall girls school, this athletic facility features include a swimming pool, gymnasium, rowing room, meeting rooms & full cafeteria. HVAC systems include a chiller, year round boiler plant, VAV air handlers & associated VAV boxes.
Professional Engineers of Ontario building
40 Sheppard Avenue West, Toronto, ON
Building on an system installed a few years ago, the owner continues to retrofit the floors to add on floor compartment fans and VAV boxes to the existing system comprised of chiller plant, boiler plant, make-up air systems and lighting controls. Extensive energy metering has been deployed to track energy usage in the central plant systems as well as floor by floor consumption.
70 University Avenue
Toronto, ON
change out of the old automation system for a latest generation BACnet system controlling all central plant chillers, boilers, air handling systems for main building and lobbies as well as CO control in the parking levels plus lighting control.
University of Toronto – Scarborough Campus
265 Military Trail, Toronto, ON
Addition of specialized lab glycol chiller system, clean room air handlers, vivarium lab controls, air gallery temperature and humidity controls plus the retrofit of a multizone air handler to a VAV air handler serving lecture halls. All systems are controlled via a browser connection allowing the owner to bypass the incumbent controls vendor and better understand the extensive capabilities of web based control.
St. Michaels Cathedral
Toronto, ON
ongoing extensive renovation and facility upgrade to this 167 year old Toronto landmark. New mechanical systems include a complete heating and chilled water central plant, multiple VAV air handling systems, extensive zone controls and energy metering.
Vaughan Mills Mall Expansion
Vaughn Mills, Toronto, ON
originally completed by Facio in 2004, this recent 200,000 square foot expansion was completed in fall 2014. The original system was upgraded to the latest Tridium AX platform and expanded for the new mall systems.
Pickering Town Centre
Pickering, ON
this 1.2 million square foot mall operates primarily via a heat pump system. The large central plant cooling towers and heat injection boiler system was completely redone using the latest in controls and variable speed pumping and fan control for impressive energy savings. The remainder of the legacy building automation system is currently being retrofitted complete with a new fibre optic backbone designed to support the new BAS plus future mall fire and security systems.